The operator is sized to the leaf, not the opening

A gate operator is chosen from the weight and width of the leaf it moves, the slope it moves across, and how many times a day it will do it. A wide ornamental double gate on a slight incline is a different machine from a single leaf on flat ground.

Getting this wrong shows up as a gate that slows down, overheats or eats batteries in year two. It is much cheaper to size correctly the first time.

Power and control at the post

An operator needs power where the gate is, and a control path back to the house or office. On a new build that is a trench and a conduit decision made before concrete; on an existing property it is often the largest hidden cost.

If the gate is far from the building, low-voltage control and a keypad or intercom at the entry are part of the same conversation. Deciding this after the posts are set usually means surface conduit.

Safety devices are not optional

A gate that moves on its own has to stop for a person, a car or a dog. Photo eyes across the opening, edge sensors on the leaf, and a monitored stop are the standard set, and they are required for a reason.

They also need to be positioned so they actually see the hazard. A photo eye mounted above a hedge is a decoration.

Choosing access control

Keypad, remote, card reader, intercom or phone-based entry — the right answer depends on who needs in and how often. A household needs something different from a yard with twelve employees and a delivery schedule.

Whatever is chosen, plan for how a visitor gets in when the system is down. A manual release is part of the design, not a failure of it.

What maintenance looks like

Automated gates need occasional attention: hinges, rollers, battery backup, and a check that the safety devices still trigger. A gate that is never looked at is a gate that fails on a Saturday.

We walk the owner through the manual release and the basics at handover, because the person who needs it will not want to read a manual in the rain.

Before you order

Measure the opening and the leaf, confirm the slope and the landing, decide the power route and the control method, then choose the operator. In that order.

If the gate is part of a larger fence project, tell us at the estimate. Retrofitting automation onto a gate built for a handle is possible, but it is cheaper to build for it.

The short version
  • Operators are sized by leaf weight, width, slope and daily cycles.
  • Power and control routes are decided before concrete, not after.
  • Photo eyes, edge sensors and a monitored stop are part of the installation.
  • Plan a manual release for when the system is unavailable.